Project Summary/background
The Yellow Pinch Water Treatment Plant (WTP) is a major infrastructure project designed to improve long-term drinking water quality and supply reliability to the southern part of the Bega Valley Shire.
The project will construct a new water treatment plant connected to the Tantawangalo–Kiah drinking water supply network.
Currently, gas chlorination of raw water is the only treatment used within this network for water supplied to the towns of Merimbula, Tura Beach, Pambula Beach, Pambula and Eden, and the villages of Wolumla, Candelo and South Pambula, and to some rural properties with a connection to a trunk main. This existing treatment system has limited capacity to manage changing water quality, especially during wet weather and following bushfire events.
A new WTP will deliver modern, multi-barrier water treatment to meet Australian Drinking Water Guideline (ADWG) limits and NSW Health-based targets. This will combine chemical treatment with filtration, leading to significantly improved water quality that supports future population growth and increases resilience to climate variability. Its location near Yellow Pinch Dam will provide a secure, gravity-fed water source for many southern communities, reducing energy use and ongoing operational costs.
This project continues Council’s strategic investment in resilient water infrastructure, following recent upgrades in the northern parts of the shire.
Purpose
The purpose of the Yellow Pinch Water Treatment Plant project is to:
- Provide high-quality drinking water that consistently meets ADWG and NSW Health-based targets
- Manage raw water quality risks associated with the Tantawanglo-Kiah Water Supply System
- Improve taste, odour and overall water aesthetics for customers
- Ensure the water network can meet future demand as our communities grow
- Increase resilience to climate extremes such as drought or high-sediment storm events
- Reduce reliance on pumping and improve operational efficiency through the selected site’s elevation and proximity to the dam.
Funding
The project is estimated to cost approximately $33 million.
It will be funded primarily through Council’s Water Fund, with Council seeking 25% co-funding through the NSW Safe and Secure Water Program. Additional external grants are being pursued to further reduce costs for the community.
Connection to Council's Community Strategic Plan
This project aligns with Bega Valley Shire Council Community Strategic Plan through:
-
Our infrastructure meets community needs.
D.1 Plan and provide for waste, water, sewerage and stormwater infrastructure and services that will meet current and future needs
-
Our air and water are clean, and our natural environment and rural landscapes are protected.
C.1 Deliver and support integrated water management.